Generator coupled · Industrial gas turbine · Solar Turbines

Generator Service for Taurus 60 Turbine

Do you run a Taurus 60 (Solar Turbines)? TEMISA Power Gen services the ELECTRICAL GENERATOR coupled to it — not the turbine. Independent ally of the OEM: overhaul, stator/rotor rewind, electrical testing and dynamic balancing, up to 350 MW, under CFE LAPEM W4200-12.

Important: TEMISA does not repair the Taurus 60 turbine. We specialize in the electrical generator coupled to it — the OEM's ally on the electrical side.

The turbine

Taurus 60Solar Turbines

  • Type: Industrial gas turbine
  • Power range: 5.2–5.7 MW
  • Application: Refinery and industrial cogeneration
  • Coupled generator: 4-pole synchronous generator
  • In our market: Very common in Mexican refinery and industrial cogeneration.

The challenge on the generator

In continuous cogeneration the generator overhaul must fit the plant's outage window — planning is critical.

Our service

Service for the generator coupled to the Taurus 60

Major overhaul (L3/L4)

Rotor removal, inspection, bearings and IEEE 115 commissioning.

Stator & rotor rewind

Class F/H coils with VPI under CFE LAPEM W4200-12 and EASA AR100.

Electrical testing

RSO, ELCID, partial discharge (OMICRON), hipot, tan delta, IR/PI, SFRA.

Dynamic balancing

Rotor balanced to ISO 21940 — up to 30 t / 3,600 rpm.

AVR & excitation

Brushless exciter / digital AVR retrofit (IEEE 421) diagnostics.

24/7 emergency

Remote <4 h · on-site <24 h · offshore <48 h. Downtime costs up to ~$125k/hr.

FAQ

FAQ — Generator coupled to Taurus 60

Preguntas que recibimos con frecuencia. ¿No encuentras la tuya? Escríbenos a ventas@temisapowergen.mx.

Does TEMISA service the Taurus 60 turbine itself?

No. TEMISA Power Gen specializes in the ELECTRICAL GENERATOR coupled to the Taurus 60 (Solar Turbines), not the turbine. We are an independent ally of the turbine OEM: we maintain, rewind, test and rehabilitate the 4-pole synchronous generator — overhaul, stator/rotor rewind, electrical testing (RSO, ELCID, partial discharge) and dynamic balancing, up to 350 MW, under CFE LAPEM W4200-12 and ISO 9001:2015.

What generator is coupled to a Taurus 60?

Typically a 4-pole synchronous generator. In continuous cogeneration the generator overhaul must fit the plant's outage window — planning is critical.

Why an independent shop instead of the turbine OEM?

Because the turbine OEM rarely specializes in the generator, and an independent multi-OEM shop cuts cost 30-50% vs OEM, responds 24/7 (remote <4 h, on-site <24 h, offshore <48 h) and avoids lock-in. Unplanned downtime can cost up to ~$125,000 USD per hour — fast, certified generator service protects continuity.

Do you serve Solar Turbines equipment across Mexico, Central America and offshore?

Yes. Independent multi-OEM service from our 5,600 m² workshop in Tlajomulco, Jalisco, with on-site field service. Quote in under 48 h.

Contact

Need service for your industrial generator or turbogenerator?

Response within 24 hours. Formal quote within 48 hours. 24/7 emergency support across Mexico and Central America.

Direct line

+52 33 3614 2460

Service hours

24/7 emergency support

Get a quote in 4 steps

Tell us what you need

Our 4-step quote form captures the essentials: service type, equipment, capacity and contact. Response in less than 24 hours, formal quote within 48.

CFE LAPEM W4200-12 · ISO 9001:2015 · IEEE / IEC