Multi-OEM service · GE Vernova

GE Vernova Generator & Turbogenerator Service

Independent multi-OEM workshop for GE Vernova synchronous generators and turbogenerators 50-700 MVA. 7HA / 9HA / STF / 7F lines. EX2100e and EX2000 brushless excitation. Overhaul under IEEE 56 + EASA AR100 + CFE LAPEM W4200-12. Workshop and onsite service across Mexico + Central America.

Independent multi-OEM workshop

About our GE Vernova service

GE Vernova (formerly GE Power + Alstom) operates a large installed base of large turbogenerators across Mexican utility power plants — CFE thermal facilities, combined-cycle IPPs, and refinery cogeneration. Beyond OEM warranty + LTSA, independent multi-OEM workshops certified CFE LAPEM W4200-12 represent the operational alternative for cost-effective full-life-cycle asset management. TEMISA Power Gen services GE Vernova generators under the same international standards GE itself applies.

Workshop capabilities

What we deliver on GE Vernova

  • Turbogenerator overhaul on 7HA / 9HA / STF / 7F lines up to 700 MVA
  • Stator rewinding with VPI Class F or H insulation under EASA AR100
  • EX2100e + EX2000 brushless excitation diagnosis, field replacement, AVR tuning
  • Cylindrical rotor inspection, dovetail repair, retaining-ring NDT and lifting under IEEE 115
  • Hot-section consultation for adjacent gas turbine sections (combustion + transition pieces)
  • Dielectric package CFE LAPEM W4200-12 (Megger + IP + Tan Delta + DP + Hipot under IEEE 95)
  • Vibration FFT under ISO 10816-2 + bearing analysis under API 670
  • LTSA gap analysis — independent assessment vs OEM-bound contractual service

Applications

Industries we serve on GE Vernova

CFE combined-cycle thermal plants

Large 7HA / 9HA gas turbogenerators 200-450 MVA serving as base-load capacity in CFE-owned facilities requiring full IEEE 56 + CFE LAPEM compliance for grid export.

Independent power producers (IPPs)

Combined-cycle plants with private LTSA expiration considering transition to multi-OEM independent service — full cost-benefit analysis available.

Refinery cogeneration

Process gas + steam turbogenerator trains in PEMEX refineries — steam turbine + generator overhaul during planned shutdown windows.

Industrial cogeneration

Medium-capacity GE generators 50-150 MVA in industrial cogeneration installations — sugar, paper, chemical, steel.

Frequently asked questions

Are you authorized by GE Vernova?

No — TEMISA Power Gen is an INDEPENDENT multi-OEM workshop. We are not an authorized GE Vernova representative. We service GE generators using IEC 60034, IEEE 56, IEEE 115 and EASA AR100 — the same international standards GE Vernova itself uses. Independent service is fully compatible once your generator is outside original OEM warranty (typically 2-5 years from commissioning).

Should I keep my GE Vernova LTSA or transition to multi-OEM service?

Long Term Service Agreements (LTSA) with GE Vernova typically cost 2-4 million USD/year per 500 MVA turbogenerator with availability guarantees and parts included. For mission-critical IPPs without redundancy, LTSA provides operational security. For utility CFE base-load with redundancy and predictable operation, independent multi-OEM service typically costs 30-50% of LTSA with equivalent technical compliance under CFE LAPEM W4200-12 + EASA AR100 + ISO 9001:2015. The business case depends on asset criticality, redundancy and internal risk management capability.

Do you service GE EX2100e brushless excitation systems?

Yes. We perform full diagnosis of EX2100e brushless excitation: rotating diodes, brushless exciter, PMG (Permanent Magnet Generator), AVR digital boards, voltage transformer cabling and protection logic. Field replacement of components is standard service — typically completed in 3-5 days onsite. Major exciter rebuild requires workshop access with 2-3 week turnaround.

What's typical lead time for major GE turbogenerator overhaul in your workshop?

For 500 MVA GE turbogenerator: 8-12 weeks workshop overhaul including disassembly, inspection, rotor balance, stator inspection, electrical testing, reassembly. Add 3-5 weeks if field rewind is required. We coordinate with onsite team for transport logistics + temporary plant operation arrangements.

Contact

Need service for your industrial generator or turbogenerator?

Response within 24 hours. Formal quote within 48 hours. 24/7 emergency support across Mexico and Central America.

Direct line

+52 33 3614 2460

Service hours

24/7 emergency support

Get a quote in 4 steps

Tell us what you need

Our 4-step quote form captures the essentials: service type, equipment, capacity and contact. Response in less than 24 hours, formal quote within 48.

CFE LAPEM W4200-12 · ISO 9001:2015 · IEEE / IEC