Offshore planning
Can the generator be serviced on board?
Access, removal clearance and lifting equipment can change the scope of offshore maintenance. Two surveys show why these conditions need review before an outage.
Read the field note →
Technical library
Notes based on field records: what was observed, what was concluded and what information is needed to assess your equipment.
Documented experience
Offshore planning
Access, removal clearance and lifting equipment can change the scope of offshore maintenance. Two surveys show why these conditions need review before an outage.
Read the field note →Temperature and maintenance
Restoring a temperature signal and completing a permanent installation are different scopes. A field record helps plan the follow-up.
Read the field note →Mechanical diagnostics
An elevated reading helps direct the investigation. Load, phase and machine-train displacement help assess a possible relationship with alignment.
Read the field note →Maintenance history
Reports from different years distinguish cleaning, mechanical work and follow-up. Reviewing them together helps define a scope with outstanding items in view.
Read the field note →Excitation system
A Stamford intervention shows how to document removed components, replacement checks and operating results while retaining outstanding recommendations.
Read the field note →Access and handling
Restricted-access handling includes disconnection, the exit route, return, alignment and verification. The Stamford record shows why these steps belong in the scope.
Read the field note →Choose the need and prepare an inquiry with your equipment information.
Review the ABB offshore L2 case and the retaining-ring and rotor-support removal evidence.
ABB 37 MVA offshore L2 maintenance →