Sector · Offshore / Oil & Gas

Offshore Generator Service for Oil Platforms

On offshore platforms, the generator runs in a salty, humid, continuous-duty environment — where downtime costs up to ~$125,000 USD per hour. TEMISA Power Gen services the generator (synchronous and aeroderivative turbogas): Class F/H rewind, testing, overhaul and emergency with marine mobilization in under 48 h. Independent, multi-OEM, CFE LAPEM W4200-12.

How we work: we service the electrical generator on the platform — the turbine OEM's ally on the electrical side, independent and multi-OEM.

Our offshore service

Generator service on the platform

Class F/H rewind + VPI

Insulation sealed against salt and humidity — recovers contaminated windings.

Electrical testing

Partial discharge, RSO, ELCID, hipot, IR/PI — baseline and trend.

Offshore emergency <48 h

Remote diagnosis <4 h + operator-coordinated marine mobilization.

Turbogas generator

Service for the generator coupled to LM2500, Centaur, RB211 — OEM ally.

Major overhaul

Controlled transport to our 5,600 m² workshop when required.

CFE LAPEM + ISO 9001

Documentary traceability for operator audits. Up to 350 MW.

FAQ

FAQ — Offshore generator service

Preguntas que recibimos con frecuencia. ¿No encuentras la tuya? Escríbenos a ventas@temisapowergen.mx.

Do you service generators on offshore oil platforms?

Yes. TEMISA Power Gen services synchronous generators and the generators coupled to aeroderivative gas turbines (LM2500, Centaur, RB211) on offshore platforms and processing centers. We mobilize a field crew with calibrated instrumentation and coordinate marine logistics; for major overhaul we transport the rotor/stator to our Tlajomulco workshop under CFE LAPEM W4200-12.

Why does the offshore environment damage the generator so much?

The salt-laden, humid atmosphere and continuous duty contaminate and degrade winding insulation and accelerate bearing corrosion. That's why partial discharge diagnostics, professional cleaning and Class F/H + VPI rewind are critical for offshore reliability.

How fast do you respond to an offshore emergency?

Remote diagnosis within 4 hours and mobilization to platform typically within 48 hours, coordinated with the operator's marine logistics. Unplanned downtime in offshore production can cost up to ~$125,000 USD per hour — priority response protects continuity.

Any OEM, in or out of warranty?

Yes. Independent multi-OEM service up to 350 MW. We are the turbine OEM's ally on the electrical side: we service the generator, not the turbine. OEM parts when required and qualified aftermarket where applicable.

Contact

Need service for your industrial generator or turbogenerator?

Response within 24 hours. Formal quote within 48 hours. 24/7 emergency support across Mexico and Central America.

Direct line

+52 33 3614 2460

Service hours

24/7 emergency support

Get a quote in 4 steps

Tell us what you need

Our 4-step quote form captures the essentials: service type, equipment, capacity and contact. Response in less than 24 hours, formal quote within 48.

CFE LAPEM W4200-12 · ISO 9001:2015 · IEEE / IEC