Skip to content
Crane lifting generator equipment at an industrial power plant

Sector · Power Generation

Generator Service for Power Generation Plants

Maintenance, repair, commissioning and rehabilitation of generators and turbogenerators for utilities, IPPs, combined-cycle plants and private cogeneration. Technical capacity. Service across Mexico, Central America and the United States.

Utilities · IPPs · Cogeneration · Combined cycle

IEEE 115IEC 60034

Industry challenges

What power generation operators are solving today

The power generation sector operates under simultaneous pressure from dispatch, fuel cost, CRE/CENACE regulation and the modernization of aged fleets. Every technical intervention has to close three equations at once: reliability, compliance and cost.

  • Fleet modernization for units with 20 to 40 years of service under public utility operation
  • Operational availability above 98% demanded by the grid for dispatchable assets
  • Variable load curve that stresses synchronous generators, exciters and rotor windings
  • Periodic technical audits required to keep generation permits valid
  • Acceptance testing under IEEE 115 and IEC 60034 for commercial operation release

Why TEMISA Power Gen

Six differentiators that matter to power generation operators

01

Technical capacity for turbogenerators in shop and field

02

Commissioning under IEEE 115 recognized for operational release

03

Fleet rehabilitation that extends useful life 15 to 25 years

04

Coordinated service for critical dispatchable assets

05

traceability for technical and regulatory audits

Standards applied

Standards we apply to power generation work

Every intervention is documented with a signed acceptance protocol under the relevant standard. Full traceability by work-order number with document traceability.

  • IEEE 115 — Test procedures for synchronous machines
  • IEEE Std 95-2002 (recommended practice, inactive-reserved) — DC high-voltage insulation testing of AC machines rated 2300 V and above
  • IEEE 43 — Insulation resistance and polarization index
  • IEC 60034-1 — Rotating electrical machines: rating and performance
  • IEC 60034-27 — Off-line partial discharge measurements
  • — Quality management system
  • ISO 10816 — Mechanical vibration of rotating machines

Illustrative example

Not a published project record.

Commissioning of a synchronous generator at a private cogeneration plant

IEEE 115

Reference guide

Release or correct

Option evaluated

When a synchronous generator is commissioned at a private cogeneration plant, Hipot DC, polarization index, power factor and grid synchronization tests under IEEE 115 show whether the unit can be released. If a result does not meet the criterion, the cause is corrected and the affected tests are repeated.

FAQ

Frequently asked questions — Power generation service

Questions we often receive. Can't find yours? Email us at ventas@temisapowergen.mx.

Do you serve generators in CFE (Mexican utility) plants?

Yes. We service the generator and its excitation system. TEMISA's CFE LAPEM qualification 053/26 and its scope are published at /en/cfe-lapem-certified.

Can you commission new generators under IEEE 115?

Yes. We deliver the full acceptance package: Hipot AC/DC, polarization index, power factor, surge comparison, no-load and short-circuit saturation curves, and grid synchronization under IEEE 115. The signed acceptance protocol supports commercial operation release.

How is an emergency at a power generation plant handled?

Priority response coordinated with plant operations. The first phase is remote diagnosis to pre-stage critical spares and the right specialist profile before mobilizing. traceability is preserved even on emergency interventions.

Do you rehabilitate aged fleets of 20 to 40 years?

Yes. We rehabilitate generators in legacy fleets: upgrade of insulation systems to Class F/H, brushless exciter retrofit with digital AVR, protection modernization and major mechanical overhaul. Useful life is extended 15 to 25 years.

Do you handle cogeneration and self-supply IPPs under permits?

Yes. We serve private IPPs under CRE/CENACE permits: efficient cogeneration, self-supply and distributed generation. We deliver commissioning, scheduled maintenance and rehabilitation under the standards currently in force.

Contact

Need service for your industrial generator or turbogenerator?

Response and quote timing confirmed after reviewing your request. Emergency support by arrangement across Mexico and Central America.

Direct line

+52 33 3614 2460

Shop hours

Monday to Friday 8:30–17:30 and Saturday 8:30–13:30 (closed Sunday)

Get a quote in 4 steps

Tell us what you need

Our 4-step quote form captures the essentials: service type, equipment, capacity and contact. Response and quote timing depend on the information received and agreed scope.

· IEEE / IEC